How to plan and cost underfloor heating

Most underfloor heating calculators divide an area by a spacing you typed and hand back a length. That answer can be unbuildable: a heating cable is a finished element that cannot be cut, so the length is not yours to choose and the spacing is not an input — it is what your choice of element does to your floor. This is the planner working the other way round, on a floor you have drawn.

Free to use. Every price and assumption is yours to change. Budgeting the rest of the electrics →

Try it on one floor

This runs the same calculation the planner runs when you tick underfloor heating on a room. Give it a small floor and a high output and watch the warning arrive — that is the answer the length-first calculators cannot give you.

One floor, sized

A fixed element. Cannot be cut — the spacing follows from the size you buy.

You do not run heat under a fitted kitchen, a bath or a wardrobe. Furniture is not deducted for you — this is where you say what is actually heated.

Prices are € and are a starting point, not a quote. In the planner every one of them is yours to change.

4.8 m² · 800 W · 102 mm c/c

Heating cable47.1 m · 800 W235 €
Heated area4.8 m² at 167 W/m²
Spacing102 mm c/c
Thermostat1 pcs90 €
Sensor conduit2.0 m2 €
Fixing strip9.6 m10 €
Materials337 €
Electrician · 3.2 hpriced at your trade rate

These are the planner's own rows, reported in metric exactly as they appear on a room's Floor tab. Hours are kept out of the materials figure on purpose. Putting them in one number is how an estimate becomes an argument — and in a project they are costed at the electrician's own rate.

The whole way through

  1. 1

    Draw the room first

    The heated area is worked out from the floor you drew, so the room comes before the heating.

    • ·Floor area is read from the drawing. Change the room and the heating follows it — there is no second measurement to keep in step.
    • ·A room that is only sketched works too. You can size the heating before you have chosen a single finish.
  2. 2

    Tick it on the floor, not on the room

    Underfloor heating is a floor trade. Select the room, open the Floor tab, and tick Underfloor heating.

    • ·It sits in the same list as parquet, tiles, levelling compound and insulation, because it is one of the things that happen to that floor.
    • ·Ticking it is enough to get a figure. Everything below is refinement, and every default is visible and editable.
    • ·Configure opens the full set of fields: form, coverage, output, cable rating, thermostats, insulation board and compound.
  3. 3

    Say how much of the floor is heated

    Set the heated share of the floor. This is the only deduction there is.

    • ·Furniture is deliberately not deducted. Guessing at a kitchen island’s footprint would be a worse number than the one you can set yourself.
    • ·You do not run heat under a fitted kitchen, a bath, or a built-in wardrobe — so the honest figure is usually well under 100%.
    • ·Set it to 0 and the room costs nothing: no element, and no thermostat either.
  4. 4

    Choose the form: cable, mats or foil

    Three products with three different constraints, which is the whole reason this is not one division.

    • ·Loose cable is a fixed-resistance element. It cannot be cut, so you buy a stock output and the spacing follows from it.
    • ·Mats are that cable already fixed to a carrier at a set spacing. Also uncuttable, so the floor is tiled with whole panels and anything left over stays cold — and the calculation says how much.
    • ·Foil is a film laid dry under a floating floor. It can be cut, but only at marked intervals, so it is the only one of the three that is roughly area-proportional. Not for tile or screed.
  5. 5

    Read the spacing — this is the part that matters

    Set the output you are aiming for and the element is picked at the nearest stock size at or above it. The centre-to-centre spacing is then an answer, not an input.

    • ·The arithmetic runs heated area → required output → nearest stock size → the spacing that size produces. It never runs area ÷ a spacing you typed.
    • ·That matters because a calculator which divides by a typed spacing will happily tell you to buy a cable that cannot be laid in your room, and you find out on the day.
    • ·When the spacing comes out too tight, the element is too long for the floor and the fix is a SHORTER cable — the size below is named, with the spacing and output it would give.
    • ·When it comes out too wide you may feel warm and cold stripes through the floor; a lower W/m cable lays closer together for the same output.
  6. 6

    Add what goes with it

    The thermostat, its floor sensor conduit, fixing strip, insulation board under and levelling compound over.

    • ·One thermostat per room or heating zone is the default; the count is yours.
    • ·Insulation board under the element stops you heating the slab instead of the room. It is off by default because whether you need it depends on what is underneath.
    • ·Set a compound depth and the volume over the element is costed with everything else.
    • ·Mats arrive with the cable already fixed to a carrier, so fixing strip is a loose-cable item only — it disappears from the list when you switch.
  7. 7

    Carry it into a project

    Link the plan to a project and the heating lands in the room’s budget with everything else drawn there.

    • ·Materials sit with the floor, because that is where you decided to put them, so the floor shows what the floor costs.
    • ·The hours go to the electrician, along with the hours from any sockets and lights you have placed — the electrician’s time is in one place.
    • ·Those hours are priced at the rate you set for that trade in the Budget tab. Until a rate is set they are counted as nothing, and the rate card says so in words.

Which form suits the floor

FormCan it be cut?Goes underWhat to watch
Loose cableNo — fixed elementTile, screed, levelling compoundThe spacing that falls out of the size you buy
MatsNo — whole panelsTile and screedWhat the panels cannot cover stays cold
FoilAt marked intervalsFloating floors onlyNever under tile or screed

A floor can also outrun the largest element made, and then it is laid as two or more. The calculation splits the output first and then picks a size for each, because picking a size and doubling it overshoots by a whole step.

What the free plan covers

Drawing a room, ticking the heating and reading the costs is free and stays on your own device. The lines worth knowing before you start:

What the work involves

The planner counts the materials. These explain what happens to the floor around them.

Common questions

Why can I not just enter the cable length I want?

Because a heating cable is not sold by the metre off a reel. It is a finished element with a fixed resistance: cut it and you change its output, or destroy it. So the length is decided when you pick a stock size, and the spacing is what that choice gives you on your floor. Asking you for a length would be asking you for a number you are not free to choose.

What spacing should I be aiming for?

The result is flagged outside roughly 80–300 mm, which is a planning band and not a regulation — too tight risks the element overheating against itself, too wide leaves cold stripes you can feel. What your element actually allows is set by its manufacturer, and that instruction beats anything here.

The mats leave part of my floor uncovered. Is that a bug?

No, it is the answer. A mat cannot be cut either, so a floor is tiled with whole panels and whatever is smaller than the smallest panel stays cold. The figure is stated rather than rounded away, because a square metre of cold floor is a real outcome. Fill the rest with loose cable, or heat a smaller area.

Can I use foil under tiles?

No. Heating foil needs a floating floor over it — laminate or engineered board. Tile and screed go with cable or mats. The product choice is not only about price.

Does the estimate include the electrician?

It includes an allowance for the hours — laying the element, mounting the thermostat and its sensor, and a fixed call-out for connecting, testing and documenting — reported separately from materials and costed at the electrician’s rate in a project. It is not a quote, and the connection itself is work for a qualified person wherever your rules say so.

Is this a check that my floor build-up can take it?

No. Nothing here is derived from a regulation. What output a given floor build-up may carry, what residual-current protection is required and who may connect it are jurisdiction-specific, and this is a shopping list and a cost for planning. Take the numbers to someone qualified; that conversation is much shorter when you arrive with them.

Where does the heated area come from if I have not drawn anything?

You can set it directly. The drawn floor is the convenience, not the requirement — the planner fills the area in from the room so you do not type a measurement twice, and you can override it.

Free to try — no sign-up, nothing to install. The whole job, in seven steps →

Quantities, hours and costs are estimates for planning and for comparing quotes. They are not a design, a certificate or a compliance check, and nothing here says what your local wiring or floor build-up rules require. Connecting a heating element is work for a qualified electrician wherever your rules say so, and the manufacturer's own instructions for an element beat every assumption on this page — check quantities and prices before ordering.