Step by step
How to track renovation costs against a budget
Most renovations are estimated once and then never measured again, which is why people find out they are over budget at the end instead of in the middle. An estimate is a guess until something is set against it. This is how to put the two side by side — what the work should cost, and what has actually left your account — room by room, while there is still something you can do about the difference.
Free to use, and it stays on your device until you ask it not to. What a budget has to contain →
Where the estimate comes from
Before anything can be tracked, there has to be a number to track it against — and that number is built from measurements, not from a cost per square metre. Change the wall below and watch what moves: the quantities are the estimate, and the estimate is what your spending will be measured against.
Your dimensions
Your materials
Framework
Fasteners
Cladding
Insulation
Trims and finishing
Quantities are worked out exactly. Prices are typical European merchant prices — an estimate to start from, not a quote; your local prices will differ. In the calculator you can type your own over them.
The whole way through
- 1
Start from the estimate you already have
Every calculation saved into a project is already a cost line. The budget does not start empty — it starts from the work.
- ·Quantities from a drawn room arrive on their own; calculations saved from a calculator page land in the room you chose when you saved them.
- ·A calculation that belongs to no room is still counted — it sits at project level, where the things that are not a room go.
- ·Every screen that shows money reads the same model, so a room’s number is the same number on the overview, in the Budget tab, on the room screen and in the printed document.
- 2
Set a budget target, and set it where the decisions happen
A project target tells you whether the job fits. A room budget tells you which room is the reason it does not.
- ·Type a figure into Budget target at the top of the tab and the estimate becomes a progress bar you can read at a glance, with Still to spend beside it.
- ·Rooms can carry their own budget as well, and a room’s remaining is measured against what has actually been spent there rather than against the estimate.
- ·Room budgets do not have to add up to the project target. They are two questions — "can I afford this" and "where is it going" — and forcing them to agree would answer neither.
- 3
Log what you spent
The Spent panel takes a date, an amount, a category and the room it belongs to. That is the whole record, and it is the half an estimate cannot supply.
- ·Assign it to a room and it counts there; leave it unassigned and it is a project cost, which is right for a skip, a tool hire or a delivery charge covering three rooms.
- ·A quote you are holding is not a bill you have paid. Log it and untick it — the row stays in the list, struck through, and stays out of the total until it becomes real.
- ·The Spent figure counts the ticked rows only, so nothing enters it by assumption.
- 4
Keep your own hours apart from someone else’s price
Your weekends and an electrician’s invoice are two different commitments, and a budget that adds them into one line is hiding the one that is negotiable.
- ·Hours you book against a room are costed at the rate in the Hours panel — that is your time, priced so it is visible rather than free.
- ·Contracted work is what someone else charges: a fixed price, or their hours at their rate. Give it a room, or leave it in the project total when it is "the electrics" for the whole job.
- ·Logged hours and a labour invoice are usually two records of the same work. Counting both would double it, so you tick which of the two is the one that counts.
- 5
Let the drawn work price its own labour — and show what it has not priced
Some calculations estimate their own hours. Each names the trade those hours belong to, so each is costed at that trade’s rate and never at whichever rate was nearest.
- ·Electrical work and underfloor heating do this today: they return hours alongside quantities, and Hourly rates prices them trade by trade — carpenter, electrician, plumber, tiler and the rest, each its own line.
- ·Before you set a rate, those hours still appear — "Electrician · 6.5 h" with no figure beside it. Hours nobody has priced are exactly the ones worth seeing, because they are the work the budget is currently pretending is free.
- ·The rates start as placeholders rather than blanks, and the panel says so: they are starting points, not quotes, and they vary by country and market.
- 6
Decide what the tools cost before they surprise you
The checklist is built from the trades in your project, and each tool is marked have, buy or hire. Only the ones you do not own add anything.
- ·Mark a tool as owned and it contributes nothing — which is the point, because a checklist that charges you for your own drill is a checklist you stop using.
- ·Buy and hire both carry a figure into the project total, so the choice between them is visible as money rather than as a shrug.
- ·The list comes from what the job actually contains: tick tiling somewhere and the tiling tools appear.
- 7
Read the gap, and read it per room
Three figures sit side by side — Estimate, Spent, Still to spend. The room breakdown under them tells you what to do about the difference.
- ·Where the money is splits the estimate by what it is for — materials, tools, contracted work — and then by room, so a single room’s share is one line rather than something to work out.
- ·A room where spend has passed the estimate is a decision you can still make. The same discovery at the end of the job is just the bill.
- ·The whole thing prints — floor plans, rooms, budget and the order list in one document — which is the version you hand to someone else.
What counts as what
Five kinds of money, kept apart on purpose. The first four make the estimate; the last one is the only thing that is actually spent.
| Line | Where it comes from | Counts toward |
|---|---|---|
| Materials | Quantities from a drawn room, and calculations you saved | Estimate |
| Your hours | Hours you book against a room, at the project’s rate | Estimate |
| Priced by the drawing | Hours a calculation works out for itself, at that trade’s rate | Estimate |
| Contracted work | A fixed price, or someone else’s hours at their rate | Estimate |
| Tools | The checklist, counting only what you buy or hire | Estimate |
| Spent | The rows you logged and left ticked — the receipts | Actual |
An unticked row stays in the list, struck through, and out of both columns — that is where a quote you are weighing sits until it becomes a bill you have paid.
What this is not
- ·Not accounting. There is no ledger, no VAT handling, no reconciliation with a bank feed, and nothing here is a record for a tax return.
- ·Not a quote. Every price is one you set or one you were given, and the total is only as good as those.
- ·Not a prediction. It tells you where you are against your own estimate; it does not forecast what the rest of the job will do.
- ·Not a contract. A contracted-work line is your note of what someone said, not an agreement with them.
What the money is being spent on
The budget counts the work. These explain what the work involves.
Common questions
What is the difference between the estimate and the actual?
The estimate is what the work should cost: materials from your quantities, your own hours at your rate, hours the drawn calculations price for themselves, and anything you have logged under Contracted work. Spent is money that has left your account — the rows you logged and left ticked. They are deliberately never mixed, because the gap between them is the only thing a budget is for.
Why are my logged hours not in the actual total?
Because they are probably already there. If you logged eight hours of tiling and also logged the tiler’s invoice in the Spent panel, counting both records the same work twice. So logged hours are costed and shown, but only counted into Spent when you tick them in — which is the right answer when the hours are yours and no invoice exists for them.
Can I record a quote I have not accepted yet?
Yes, and it is worth doing. Log it in the Spent panel and untick it: the row stays in the list, struck through, so the record survives, and stays out of the total until it becomes a real bill. Holding three quotes for the same work and seeing them side by side is more useful than remembering two of them.
Do room budgets have to add up to the budget target?
No, and they are not checked against each other. A project target answers "can I afford this job"; a room budget answers "where is the money going". Forcing them to reconcile would mean every revision to one became an argument with the other, and most people set a project figure first and only budget the rooms they are worried about.
Why does Hourly rates show hours with no cost next to them?
Because a rate has not been set for that trade yet. Those hours are real — the electrical calculation worked them out from the points and circuits you drew — and leaving them invisible until they are priced would mean the budget silently treats that work as free. An unpriced number you can see is better than a missing one you cannot.
What happens to tools I already own?
Nothing, which is the intent. The checklist is built from the trades your project contains, and every tool is marked have, buy or hire. Only buy and hire carry a cost. Marking what you own is how you stop the list from pricing a toolbox you already have.
Can I give this to a builder or a bank?
You can print it: floor plans, rooms, the budget and the materials list as one document. It is an estimate at prices you set, not a quote and not a valuation, and that is what makes it useful to put in front of someone who does quote — they can see your assumptions and tell you which are wrong.
Does this need a paid plan?
The budget itself works on the free plan, on your own device: one project, three saved calculations, spending, hours, rates, contracted work and tools. Beyond three calculations you need a paid plan, as you do for cloud sync, photos and more than one project. The printed document needs a paid plan too, and only Pro gets it without a watermark.
Free to try — no sign-up, nothing to install. The whole job, in seven steps →
Free to try — no sign-up
Draw it once. Every trade prices itself.
Measure the room on screen and its floor, wall and ceiling areas fill the calculators in for you — insulation, boards, paint, tiles — each with its own quantity and cost against one running total.
Free covers one project, three saved calculations and a two-room plan. What a Project Pass adds →